Short answer
A snag list records incomplete or defective work at handover, and the defect liability period is the time after completion when the contractor must fix defects. Both should be written into the contract, with retention money linked to closing them.
Preparing the snag list
Inspect room by room with the contractor and record each item with location, photo and responsible party.
Agree target dates for closure.
Tracking closure
Re-inspect closed items and keep the list updated until everything is resolved.
Do not accept handover of systems that have not been tested.
Defect liability period
The contract should state the period and how defects are reported and repaired.
Your advocate or contract adviser should review these terms before signing.
Retention and release
Retention money withheld from payments gives the contractor a reason to return for repairs.
SJAIN can manage snag tracking and defect follow-up for owners as part of project management.