Short answer
Stop adding pressure and establish facts first: what is complete, what is defective, what is paid for and why progress stopped. Then re-plan the remaining work, settle contractual positions with advice, and restart with a realistic programme, clear responsibilities and regular inspection.
Establish the facts
Collect drawings, contracts, BOQs, measurement records, payment history, correspondence and site photographs. Commission a measured survey and, where structure is in question, an assessment by a qualified structural engineer.
Separate causes of delay — design gaps, funding, contractor capacity, material supply, approvals or site issues — because each needs a different remedy.
Re-plan the remaining work
Prepare an updated scope and BOQ for the balance of work, identify long-lead items and agree a programme with realistic durations and dependencies.
Resolve missing design information before restarting, so the site does not stop again for drawings.
Contracts and responsibilities
Decide with your legal adviser whether to continue with the existing contractor, renegotiate or appoint others. Record any handover of incomplete work carefully, including defects and liability.
Clarify who is responsible for design, construction, inspection and approvals going forward.
Restart with control
Hold weekly progress reviews against the programme, link payments to inspected work and record all changes in writing.
SJAIN can survey, re-plan and supervise recovery work as coordinator; appointed consultants and contractors retain their professional and construction responsibilities.