Short answer
Lifts, power and water are hard to change after construction. Size lifts for expected occupancy, estimate electrical load with an MEP consultant and apply to the power utility early, and plan water storage, pumps and service shafts into the structure from the start.
Lifts
Lift numbers, capacity and speed depend on floors, occupancy and use; your MEP consultant and lift supplier should calculate them.
Consider a service or goods lift for retail, clinics or hospitality.
Power
Estimate connected load for tenants and common areas, and apply to the electricity distribution company early as supply arrangements can affect design.
Plan backup power, metering per tenant and space for panels and transformers if required.
Water and drainage
Plan underground and overhead storage, pumps, treated water needs and drainage based on use and occupancy.
Rainwater harvesting and any authority requirements should be confirmed by your consultants.
Shafts and access
Reserve vertical shafts and access for future maintenance and tenant connections.
SJAIN can coordinate MEP consultants and contractors; system design remains the engineers' responsibility.