Corporate office interior delivered by SJAIN Spaces

Raipur guide · Building planning

Handover and Documentation Checklist for New Commercial Buildings in Raipur

A handover checklist for new Raipur commercial buildings: snag closure, testing and commissioning, as-built drawings, warranties, manuals and approvals on file.

Short answer

A proper handover gives the owner a working building and the documents to run it. Close snags, witness testing and commissioning, and collect as-built drawings, warranties, operation manuals and copies of approvals before final payments.

Snags and testing

Walk every area with the contractor, record snags with photos and track closure.

Witness testing of electrical, plumbing, fire, lifts and HVAC systems.

Documents

Collect as-built drawings, equipment lists, warranties, guarantees and operation and maintenance manuals.

Keep approval and occupancy documents on file as issued by the authorities.

Training and contracts

Arrange training for your facility team and set up maintenance contracts for key equipment.

Record meter readings and keys handed over.

Final payments

Link retention release to snag closure and the defect liability period in the contract.

SJAIN can manage handover on the owner's behalf; approvals and certificates come from the relevant authorities and professionals.

Have land or a building in Raipur?

Get a free site or land assessment from our Kamal Vihar team.

Turnkey office construction in Raipur