Short answer
A proper handover gives the owner a working building and the documents to run it. Close snags, witness testing and commissioning, and collect as-built drawings, warranties, operation manuals and copies of approvals before final payments.
Snags and testing
Walk every area with the contractor, record snags with photos and track closure.
Witness testing of electrical, plumbing, fire, lifts and HVAC systems.
Documents
Collect as-built drawings, equipment lists, warranties, guarantees and operation and maintenance manuals.
Keep approval and occupancy documents on file as issued by the authorities.
Training and contracts
Arrange training for your facility team and set up maintenance contracts for key equipment.
Record meter readings and keys handed over.
Final payments
Link retention release to snag closure and the defect liability period in the contract.
SJAIN can manage handover on the owner's behalf; approvals and certificates come from the relevant authorities and professionals.
Have land or a building in Raipur?
Get a free site or land assessment from our Kamal Vihar team.
Turnkey office construction in Raipur